Organic Line Anwendungsschema für Cannabis
Dieses Anwendungsschema zeigt dir klar, welches Produkt in welcher Phase sinnvoll eingesetzt wird - nicht für kurzfristige Effekte, sondern für ein stabiles, biologisch aktives Substrat, das deine Pflanze über den gesamten Zyklus zuverlässig trägt.
You don't control the plant. You control the system.
What you should know before using the schedule
This application scheme is a reference for stable, biologically driven runs. It does not replace assessing substrate, water quality, pot size, genetics, and plant pace.
Reference, not a rigid framework
The condition of the medium, water quality, pot size and the plant's actual behavior always remain decisive.
Organic products need lead time
TopDress Bloom is not an instant fix. Organic supply must be established early so it becomes available in time.
Moderate dosages are intentional
The goal is not maximum load, but controlled stability in the system.
Small pots under 40 liters
Especially in smaller pots, the calcium-magnesium ratio in the irrigation water should be observed, because the system there is more sensitive to unbalanced water values.
How the application scheme works
This scheme is not product-centered but substrate-centered. The goal is not to intervene every week, but to manage the medium so it remains active, resilient and stable.
That's exactly what the CannaSelection Organic Line is designed for: build structure, set an organic base, keep microbiology active and cushion water problems.
Living Soil Base
Creates structure, buffering and an organic foundation for an active medium.
MicroBio+
Is not an add-on, but a microbial starter and stabilizer in the system. Supports biological processes and makes existing nutrients in the medium available faster.
TopDress Bloom
Is applied early in bloom so organic nutrients become available in time.
Mineral Charge
Buffers minerals and is especially relevant when water values or an unfavorable calcium-magnesium ratio put the system under pressure.
Dosing standards at a glance
These dosages are deliberately chosen to be moderate and serve as a practical reference. They are meant to stabilize the system, not overload it.
Continuous system stabilization
- Standard: 2 – 4 ml per liter of water
- Finish: 2 ml/L after clarification or flush
- Use: Soil and Coco
Keeps microbiology active and supports biological processes in the substrate throughout the entire run.
Structure and biological foundation
- New setup: 10 – 30 g per liter of soil
- Topdressing: 1 – 2 g per liter of pot volume
- Rhythm: every 3 – 4 weeks
Creates an organic foundation, buffering and stability in the medium. Those seeking the full potential let the substrate mature for 2 – 5 weeks in advance.
Early bloom supply
- Application: 1 – 2 g per liter of pot volume
- Timing: early in bloom
- Logic: Organic weekly addition
Not used for an immediate effect, but to ensure organic nutrition is available in time during the later bloom.
Targeted buffering of sensitive systems
- Application: 1 – 2 g per liter of pot volume
- Rhythm: every 3 – 4 weeks as needed
- Particularly useful: with problematic water values
Helps especially when water values put the medium under pressure, particularly in smaller pots under 40 liters.
Vegetation phase
In vegetation it's about activating the medium, building root space and creating the foundation for a stable transition into bloom.
- MicroBio+: 2 ml/L
- Living Soil Base: Optional to mix in
- Mineral Charge: –
- MicroBio+: 2 ml/L
- Living Soil Base: –
- Mineral Charge: –
- MicroBio+: 2 – 4 ml/L
- Living Soil Base: Topdress 1 – 2 g/L pot volume
- Mineral Charge: Topdress 1 – 2 g/L pot volume
- MicroBio+: 2 – 4 ml/L
- Living Soil Base: –
- Mineral Charge: –
- MicroBio+: 2 – 4 ml/L
- Living Soil Base: –
- Mineral Charge: –
| Week | MicroBio+ | Living Soil Base | Mineral Charge | Goal |
|---|---|---|---|---|
| Vegi 1 | 2 ml/L | Optional to mix in | – | Activate soil, secure root start |
| Vegi 2 | 2 ml/L | – | – | Stabilize microbiology |
| Vegi 3 | 2 – 4 ml/L | Topdress 1 – 2 g/L pot volume | Topdress 1 – 2 g/L pot volume | Build structure and mineral buffering |
| Vegi 4 | 2 – 4 ml/L | – | – | Even vegetative growth |
| Vegi 5 | 2 – 4 ml/L | – | – | Prepare the system for bloom |
Bloom phase
The bloom is not managed reactively but with lead time. That's exactly why TopDress Bloom is applied at the very start of bloom.
TopDress Bloom is applied right at the start of bloom because organic nutrients need time to be processed. Those who topdress too late often react only after the deficit has already affected the system.
- MicroBio+: 2 – 4 ml/L
- TopDress Bloom: Topdress 1 – 2 g/L pot volume
- Mineral Charge: –
- MicroBio+: 2 – 4 ml/L
- TopDress Bloom: –
- Mineral Charge: –
- MicroBio+: 2 – 4 ml/L
- TopDress Bloom: –
- Mineral Charge: Topdress 1 – 2 g/L pot volume
- MicroBio+: 2 – 4 ml/L
- TopDress Bloom: –
- Mineral Charge: –
- MicroBio+: 2 – 4 ml/L
- TopDress Bloom: Topdress 1 – 2 g/L pot volume
- Mineral Charge: –
- MicroBio+: 2 – 4 ml/L
- TopDress Bloom: –
- Mineral Charge: –
- MicroBio+: 2 ml/L
- TopDress Bloom: –
- Mineral Charge: –
| Bloom week | MicroBio+ | TopDress Bloom | Mineral Charge | Goal |
|---|---|---|---|---|
| Bloom 1 | 2 – 4 ml/L | Topdress 1 – 2 g/L pot volume | – | Establish organic nutrient base early |
| Bloom 2 | 2 – 4 ml/L | – | – | Support conversion of organic fractions |
| Bloom 3 | 2 – 4 ml/L | – | Topdress 1 – 2 g/L pot volume | Ensure mineral stability |
| Bloom 4 | 2 – 4 ml/L | – | – | Maintain balance in the system |
| Bloom 5 | 2 – 4 ml/L | Topdress 1 – 2 g/L pot volume | – | Provide a second organic supply |
| Bloom 6 | 2 – 4 ml/L | – | – | Manage the ripening phase calmly and stably |
| Bloom 7 | 2 ml/L | – | – | Transition into the final bloom |
Small pots under 40 liters need more attention regarding irrigation water
The smaller the substrate volume, the lower the system's natural buffering capacity. Especially in pots under 40 liters, the calcium-magnesium ratio in the irrigation water should be checked carefully.
Not every problem in small pots is automatically a fertilization issue. Instability often arises because the water permanently pushes the substrate into an unfavorable ratio.
Mineral Charge can support here in a targeted way, but it does not replace a proper assessment of water values.
Final bloom / Finish
If a flush or clarification is done at the end, MicroBio+ can be used specifically to help the medium run out cleaner.
Clarify the substrate
Thoroughly flush the medium with clear water to remove old salts and residues.
Apply MicroBio+
Then apply MicroBio+ at 2 ml/L to support biological activity in the draining medium.
1 – 2 applications
Give 1 – 2 applications in the last 10 – 14 days, depending on genetics and desired finish.
Don't just revive the substrate, rebuild it systematically
A resilient reactivation does not result from a single product, but from the interplay of structure, organic foundation, mineral buffering and microbial activation.
This is exactly the role of MicroBio+: it is not an add-on but the microbial starter in the process. It supports microbiology and helps make existing nutrients in the system available faster. For a clean reconditioning we therefore recommend reactivation ideally in combination with the Organic Line and – depending on water and mineral situation – Mineral Charge.
Remove old roots and plant residues.
Rinse and loosen the substrate several times with clear water.
Rebuild structure and an organic foundation with Living Soil Base.
Add Mineral Charge if needed when water or mineral ratios are putting the system under pressure.
Apply MicroBio+ at 5 ml/L to actively kickstart biological processes.
Let the substrate rest and mature for 2 – 6 weeks.
MicroBio+ is not a sole problem solver here, but the microbial starter in the reactivation process. A resilient reconditioning is achieved in combination with the Organic Line and – depending on the starting situation – Mineral Charge.
Typical mistakes when working with organic schemes
Too late topdressing
Organic nutrients don't act immediately. Those who only react to visible deficits are usually already too late.
Too high dosages
More input does not automatically mean more performance. Overloading costs stability.
Ignoring water values
An unstable calcium-magnesium ratio can put an otherwise functioning system under unnecessary stress, especially in small pots.
Use MicroBio+ only as an emergency product
MicroBio+ is not a panic tool, but part of a stably managed system.
Frequently asked questions about the application scheme
Is the scheme mandatory or just a guideline?
It is a practical reference. The decisive factors always remain substrate, water quality, pot size, genetics and plant speed.
Can I use the scheme in Coco as well?
Yes. The scheme is also suitable for Coco, especially in biologically or hybrid-managed applications.
Do I need Mineral Charge in every setup?
No. Mineral Charge is particularly useful when water values or calcium-magnesium ratios are putting the system under unnecessary pressure.
Why is TopDress Bloom applied so early?
Because organic nutrients need time to be converted. The product is not used for an immediate effect, but to provide timely available nutrition.
Is MicroBio+ only intended for problems?
No. MicroBio+ is a microbial starter and stabilizer in the system and not just an emergency measure.
It's not a single measure that decides; it's the stability of the system over the entire run.
This application scheme gives you a clear reference for biologically managed runs: organic foundation, active microbiology, targeted mineral buffering and deliberately moderate dosages.